Go to homepage

#statusMessage#

Do you want to start the comparison now?

Note
Select at least one product via the “Compare” function to activate the product comparison.

Testing Inverter Hardware under Realistic Load Conditions.

How can inverter hardware be tested under realistic conditions when the complete drivetrain is not yet available? The AVL Active Load Cabinet (ALC) provides defined electrical load conditions for high-voltage functional testing, opening up new possibilities for development and validation.

Test Inverters Early and Reproducibly.

During the development of electrified drive systems, inverter hardware must be tested under various load conditions even in the early project phases. At this stage, the actual electric motor or complete drivetrain is often not yet available.

Conventional tests using passive loads offer only limited possibilities for simulating different operating conditions. An active load makes it possible to specify defined electrical conditions and perform reproducible tests. This allows hardware testing to begin earlier in the development process.

Active Load for High-Voltage Functional Testing.

This is where the AVL Active Load Cabinet comes in. The product serves as an active load for high-voltage functional testing of inverters and enables hardware testing under defined electrical load conditions.

The ALC is based on a simplified emulation of electrical motor characteristics and is specifically designed for functional testing of inverter hardware. It is therefore particularly suitable for use in the early stages of inverter development.

View the AVL Active Load Cabinet in detail


Testing Capabilities of the ALC.

Different operating modes are available depending on the test requirements. Four-quadrant operation allows both motoring and generating operating conditions to be simulated. In R-L mode, the system operates as an adjustable resistive-inductive load, allowing different electrical load conditions to be specified.

The ALC can also optionally be used as a single-phase current source, for example to calibrate the internal current sensors of the device under test (DUT) or to test connectors. Further technical details, configurations and options are available on the product detail page.


Benefits for Development and Validation.

Using an active load offers additional possibilities, particularly in the early stages of development.

  • Test hardware earlier: Inverter hardware can be tested before all components of the final drive system are available.
  • Develop hardware and software in parallel: Hardware testing can be performed with less dependence on the final software version.
  • Detect faults early: Functional testing with active power helps identify malfunctions during hardware development.
  • Reproduce test conditions: Electrical load conditions can be specified and repeated for different test cases.
  • Integrate into test benches: The system is designed for integration into laboratory and automated test environments.


The AVL Active Load Cabinet in Practical Applications.

The AVL Active Load Cabinet supports various tests during the development and validation of inverter hardware. Three typical application scenarios illustrate how the system can be used in practice.

Parameter testing: Verify measurement accuracy and functionality.
Parameter tests are performed before, during and after endurance testing to verify the accuracy of current and voltage measurements and the functionality of the inverter hardware. The ALC makes it possible to set specific operating points and test them under realistic load conditions. This allows deviations to be detected early and quality risks to be reduced.

Active power testing: Test motoring and generating operation.
Tests under an active electrical load are essential for developing inverter hardware. In four-quadrant operation, the ALC enables testing in both motoring and generating modes. This allows different operating conditions to be verified under realistic conditions and potential malfunctions to be detected during hardware development.

Phase reconstruction: Test hardware without complete control software.
In the early stages of development, inverter prototypes often do not yet have current control or angle detection. Using the three-phase current source, the ALC can reconstruct the phase angle and enable realistic load conditions in motoring and generating operation. This allows hardware tests to be performed before the final inverter software is integrated.


Which Tests Is the ALC Suitable For?

The Active Load Cabinet is particularly suitable for development and validation tasks involving inverters and power electronics.

Typical applications include:

  • High-voltage functional testing of inverter hardware
  • Development and validation of inverter and power electronics hardware
  • Testing different electrical load conditions
  • Research and development test benches
  • Automated test environments for electric drive systems
The product therefore addresses applications in the automotive and e-mobility sectors in particular, as well as other development areas involving electric drive systems.

Active Load Cabinet for Your Inverter Tests.

Would you like to test inverter hardware with active power or expand your existing test bench environment? dataTec supports you in selecting and configuring a suitable solution.

Enquire about the ALC Active Load Cabinet